Compton is chalk escarpment village immediately south of Winchester with high-value detached properties on exposed chalk ridge above the Itchen Valley. chalk escarpment above the Itchen Valley with the highest wind exposure of any area in the coverage zone; north and west-facing pitches face unobstructed south-westerlies. wind loading on the chalk ridge is the dominant fascia failure driver; properties above Shawford station have the most exposed elevations. We inspect the timber behind every fascia board before fitting new ones. Where rafter feet are rotten, we report in writing before quoting β the repair is included in the price from the outset, not added as a surprise during the job.
Fascia and Soffit Replacement in Compton
Modern cellular foam-core uPVC fascia board is substantially stronger than the hollow-section products from the 1980sβ90s. We install cellular boards throughout in white, cream, grey, brown and anthracite. For period Compton properties where uPVC would be visually inappropriate, we specify painted hardwood or aluminium-capped systems. On most Compton properties, a full roofline renovation takes one day.
Material Choice and Fascia Condition in Compton
Free survey and written quote in Compton. No call-out fee. No obligation. Call 01962 809171.
Fascia and Soffit Costs in Winchester (2025)
| Job Type | Typical Cost |
|---|---|
| Full roofline (semi) β fascias, soffits, guttering | Β£600βΒ£1,200 |
| Full roofline (detached) | Β£1,000βΒ£2,000 |
| Bargeboard replacement (per gable) | Β£150βΒ£350 |
| Rafter feet repair (if required) | Included in quote |
| Period-appropriate hardwood systems | +20β40% on uPVC |
What a Fascia Replacement Involves
We start every fascia job by inspecting behind the existing boards β removing a section to check the rafter feet for rot. Where rafter feet are damp or rotten, we repair them before fitting new fascias. New cellular foam-core uPVC fascias and soffits are fixed to the rafter feet with stainless screws. Vented soffit sections are fitted where the roof space requires through-ventilation. New guttering is fitted last, fixed to new fascia brackets at the correct fall. Most Winchester 3-bed semis take one day. Free survey and written fixed quote β call 01962 809171.